Technical specifications
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
SYRIAN ARAB REPUBLIC
MINISTRY OF ELECTRICITY
PUBLIC ESTABLISHMENT FOR DISTRIBUTION
OF ELECTRICITY
TENDER DOCUMENTS
TECHNICAL SPECIFICATIONS
Three Phase
ACTIVE AND REACTIVE ENERGY
MULTI-FUNCTION, MULTI-TARIFF STATIC METERS
3x230/400 volt, X/5 Amp
Dr. Eng. Issam Bahssas
Eng. Mohammad Yassin Mohammad
Eng. Zaher Al khen
Assist.Eng. Mohssen Seif Edin
Assist.Eng . Abdulla Saraiji
Approved by General Director
Eng. Mustafa Shekhani
Three Phase (X/5A) Meter Specifications Bid ( )
1 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
Content :
3 General conditions.
5 Documents of technical offer.
6 Sample for testing.
7 Testing and inspection for shipments
8 Guarantee schedule
9 Price Schedule .
Three Phase (X/5A) Meter Specifications Bid ( )
2 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
1- Introduction :
These specifications cover the bid minimum technical requirements for the design;
manufacture, supply, and testing of static meters to be used with three phase alternating
current, in the distribution system of the PEDE under the service conditions of Syria.
The bidder must carefully read this tender document because in case the submitted
sample or offer contained any discrepancies with the detailed technical specifications the
offer will be rejected.
The bidder must completely fulfill the technical requirements and specifications listed in this
document and the offers that pass the technical check will be financially evaluated.
Test samples should be sent with the offer free of charge and will be considered as essential
If any bidder has any inquiry about any part of this tender documents, should address his
inquiries to the following address:
Public Establishment for Distribution and Exploitation of Electricity
17 Nisan Street, Baramkeh Sq., Damascus (Syrian Arab Republic)
P.O. Box: 4900
FAX: 2223686,
2- DEFINITIONS:
shall mean Public Establishment for Distribution of Electrical
PURCHASER
shall mean PEDE.
shall mean all the documents submitted by the supplier, bidder,
and manufacturer
shall mean supplier, manufacturer or bidder
SUCCESSFUL
shall mean the manufacturer, supplier, whose offer has been
accepted by the Purchaser
CONTRACTOR
shall mean the Bidder, whose offer has been accepted by the
Purchaser, with addition to approved contract between them.
IEC Documents
shall means standards, reports and publications concerning static
meters and issued by International Electrotechnical Commission
Three Phase (X/5A) Meter Specifications Bid ( )
3 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
3. General Conditions:
3.1. The meters are intended for indoor installation.
3.2. The meters will serve for measuring electrical quantities of consumers.
3.3. The meters must be multi-tariff (multi-functional) with the low consumption LCD
registers, operated in a cyclic mode.
3.4. At a time of delivery the meters must be set (programmed) to register and display
active energy with our tariff settings; but the necessary program must be delivered
with the meters in order to activate necessary number of tariffs (4) and to configure
other multi-functional meter functions and operations.
3.5. In order to maintain their multi-functional performance, the meters must be equipped
with a real time keeping function which include time and date (year, month, day) and
serve the event and all function, the meter must be equipped also with appropriate
interface for bi-directional communication with the meter.
3.6. Environmental Conditions:
3.6.1. Altitude above sea level
3.6.2. Maximum ambient temperature
3.6.3. Minimum ambient temperature
3.6.4. Average maximum temperature
3.6.5. Maximum temperature variation in one day 20 °C.
3.6.6. Average maximum relative humidity up to 80 % at 30 °C.
3.7. It is acceptable to offer meters equipped with four measuring devices, one additional
for the neutral.
3.8. In case the neutral is disconnected, meter must work accurately (Balance and
unbalance Load).
3.9. The meter should be capable to detecting, disply on LCD screen and recording
occurrences of missing phase (one-phase or two phases) which can happen due to
intentional/accidental (disconnection of phase links).
The meter should be capable of detecting current reversal with phase
identification. The meter should always log energy in forward direction (Active
Energy) even if the current is following in negative direction, in one or more phases "sum of absolute per-phase values in Active Energy".
Three Phase (X/5A) Meter Specifications Bid ( )
4 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
4. STANDARDS :
The offered meters shall be designed, manufactured and tested in conformity with the latest
applicable IEC (International Electrotechnical Commission)
All requirements and values, specified in these Technical Specifications, exceeding the
reference documents requirements are obligatory.
5. DOCUMENTS OF TECHNICAL OFFER:
The offer the enclosed documents and references shall be submitted in English.
A complete technical offer shall include three copies of the following documents in
5.1. The Bidder and manufacturer should fulfill the guarantee schedule sign and stamp it , i.e the
declaration and confirmation of their approval and commitment to all of the guarantee
schedule content.
5.2. To provide complete sets of detailed dimensions drawings and catalogues of the offered
5.3. Furthermore Error curves for:
Ambient temperature variation.
Frequency variation. Voltage variation. Current variation with P.F. = 1 , P.F. = 0.5 ind P.F. = 0.8 cap.
5.4. Instruction book for installation, operation and maintenance.
5.5. Quality assurance certificate that is valid within the period of submitting the offer, issued by an
independent authority.
5.6. To provide "DLMS/COSEM" certificate for the type of the submitted meters.
5.7. Type Test certificates for the offered meters issued by a famous and independent authority.
5.8. User Manual for Software of (PC and HHU).
6. SAMPLE FOR TESTING:
6.1. The bidder must submit with his offer a METER as a sample for testing, which must
have all requested specification in this document.
6.2. The Sample must be submitted without any break and mistakes.
6.3. Although the meter cover should be firmly sticked as stated in item 12-2 of
guarantee schedule, the sample meter should be provided without sticking to
enable the evaluation committee to open the meter cover to inspect its
components.
Three Phase (X/5A) Meter Specifications Bid ( )
5 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
6.4. The sample must be equipped with corresponding optical port to read and
program the meter by HHU and PC.
6.5. The sample must be equipped with serial port RS485.
6.6. The PC software on CD must be submitted with sample.
6.7. Test reports for at least the following tests
according to IEC standards should be
submitted with the sample dully singed and stamped :
6.7.1. Limits of error due to variation of the current .
6.7.2. Limits of error due to voltage variation, the voltage variation range according to
tender document are 0.7-1.15 of rated voltage.
6.7.3. Limits of error due to frequency variation .
6.7.4. Accuracy test in the presence of harmonics including.
6.7.5. Influence of self heating.
6.7.6. AC voltage test.
6.7.7. Test of no-load condition.
6.7.8. Test of Starting current.
6.7.9. Meter constant test.
6.7.10. Spring hummer test.
6.7.11. Resistance to heat and fire.
6.7.12. Power consumption.
6.8. Test reports for at least the following tests and bid special requirements should be
submitted with the sample dully singed and stamped :
6.8.1. Accuracy at reverse current occurred by exchange of current leads.
6.8.2. Test for meter body material showing that it is made of high quality reinforced
6.8.3. Check for the missing phase and missing neutral feature described in article 3.
The meter should give a message on the LCD indicating for missing phase and
missing neutral.
1. PEDE will reserve the right to run the above tests or any other test described in IEC Standards
and technical specifications.
2. To pass the technical check the bidder should :
a. Completely fulfills all the requirements and specifications of this tender document.
b. Confirm it commitment to the guarantee schedule content as explained in item 5-1.
c. Provide reports for successful testes described in item 6.6 & 6.7
d. Pass the tests made by the PEDE committee according to first note.
Three Phase (X/5A) Meter Specifications Bid ( )
6 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
3.
The bidder or his official technical representative should attend the testes
conducted by PEDE committee, and in case he did not attend these tests he will
not have the right to make any objection on tests results. The bidder will be
informed about tests date, time and place by a fax sent to the fax number
mentioned in the bidder offer.
7. Testing and inspection for shipments:
7.1. The offered products shall be tested in accordance with the IEC standards and
specifications mentioned in this book.
7.2. The contractor shall make necessary tests at the manufacturer premises in his
country; provide all the testing facilities PEDE representatives within the range
of requirements. All the instruments to be used for testing shall be calibrated by
a recognized and approved laboratory. The test certificates shall bear the details
7.3. The meters should be in good appearance.
7.4. The visual inspection and routine tests shall be carried outs on each dispatch of
7.5. In case of failure of random sample(s) in special or routine tests and quality of
any shipment of meters not meeting the requirements; the PEDE EE will reject
this shipment of meters.
7.6. Test certificates shall include in addition to test results:
7.6.1. The order number of the PEDE.
7.6.2. The logo/the name of the manufacturer of meters.
7.6.3. The date of testing.
7.6.4. The signature of the test supervisor.
7.7. The success of tests and inspections at the manufacturer country at the attendance
of PEDE representatives, means that the contractor can ship the meters to Syria
but does not mean the initial acceptance of meters, because the initial acceptance
tests will be conducted in Syria.
Three Phase (X/5A) Meter Specifications Bid ( )
7 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
8. Guarantee Schedule : to be signed and stamped by the bidder and
Description of PEDE Requirements
Offered Data
The meter is multi tariff & multi function, with at least 4
tariffs and multi group tariffs (daily, monthly, seasons…).
The meters must be equipped with a real time keeping
function which include time and date (year, month, day),
the meter must be equipped also with appropriate
interface for bi-directional communication with the meter.
In case of reverse energy the meter must always account
energy as positive.
The meters must have impulse test output in addition to
two separate LEDs for test accessibility, one for active energy and the other for reactive energy
Operation range :
Temperature from -10 ºC to + 55 ºC
Relative humidity at 30 ºC is 80%
Rated current (In) = 5 A
Maximum Current (Imax) = 6 A
Rated voltage Vn = 3 x 230/400v
Voltage variation range from 0.7Vn to 1.15Vn
Rated frequency = 50Hz
Frequency variation range = ± 2 Hz
AC withstand voltage = 2KV
Impulse withstand voltage 1.2/50µS = 6KV
Class of meter =
class 0.5 for active energy and
class 2 for
reactive energy.
Three Phase (X/5A) Meter Specifications Bid ( )
8 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
The meter base is made from high quality polycarbonate.
The meter cover is made from high quality polycarbonate.
The meter's cover should be stuck firmly so that it can't be opened unless by breaking it or by making trace apparently, in this case the battery of meter can be
replaced without need to open the meter cover, and has independently sealed .
The meter cover should have independent sealing.
The meter should be equipped with a sensor to detect
Terminal block :
All parts of each terminal shall be such that the risk of
corrosion, resulting from contact with any other metal
parts is minimized.
Minimum cross section of the terminal block holes ≥ 6 mm2.
The manner of fixing the conductors to the terminal shall
ensure adequate and durable contact.
The terminal block should be made of high quality
reinforced polycarbonate or Bakelite
The terminal block cover should be made of high quality
The terminal block cover should be extended to cover all
wiring and must have a separate sealing.
The connection diagram should be clearly printed on the
terminal block cover.
The terminal cover should be transparent that all
connections can be seen with no need open the terminal cover.
The meter should be equipped with a sensor to detect
terminal cover open.
Degree of protection is at least IP51.
Three Phase (X/5A) Meter Specifications Bid ( )
9 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
Register type is LC with min 8 digits (one of them for
decimal) , 8mm hight
LCD reading distance at least from 1m.
When the meter is not energized the electronic display can
be made visible for at least active energy and Reactive energy value , by pressing a push button.
The meter shall have the following display modes:
- The LCD must show the instantaneous values of
(current, voltage, Active energy, Reactive energy and PF).
- Automatic sequencing display with min. 8 sec
retention time displaying programmed set-up values for observing during normal meter operation; the available data to showing on LCD at least is:
1- Billing data.
2- Historical data.
3- Date and Time.
4- Meter serial number.
5- Instantaneous values (current, voltage ,PF, Active
energy and Reactive energy ) for each phase and total.
The LCD should contain three lists at least and the
LCD should be programmable according to:
1. The first list is for (Current active & reactive
energy, last historical active & reactive energy & Max Demand)
2. The second list is for (instantaneous values).
3. The third list is for remnant data.
Codes for values on display should comply with IEC
OBIS identification.
The meter must have alternate button for switch between
the lists of LCD
Three Phase (X/5A) Meter Specifications Bid ( )
10 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
Each meter shall bear the following information.
The nameplate shall bear the purchaser logo and name
The serial Number must be as form: YYCTXXXXXX
YY: Year of manufacture. C: symbol of company (determine later). T: type of meter (1 for single phase, 3 for three phases). XXXXXX: sequence number.
The meter record Max Demand For Active and reactive
energy with date and time stamp.
The meter must record and display the historical data
(Billing and Max demand) with programmable options for one year at least.
The meter must record at least 100 events for all power
connection events (reverse current, power on and power off…etc).
The meter must record at least 50 events for all log events
(main cover open, terminal cover open, change setting and reset events).
Meter should record start and finish date & time stamp for
Hand held and PC must display Events
The meter must record the following information:
Number of power off events & time and date of last
power off event.
Number of reset operations & time and date of last
Reset operation.
Max demand + Historical Readings' registries: These
registries can record measured values of active energy and reactive energy with four tariffs at first day of month (at least) for one year at least.
The meter must record load profile with
programmable setting.
The load profile should consist of 8 channel at least
Three Phase (X/5A) Meter Specifications Bid ( )
11 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
(currents for each phase, voltage for each phase, active and reactive energy).
Each channel should able to store 4320 reads at least.
The meter should have a password permission to writing
The meter should capable to insert Transformer Factor
and its effects (processing, calculations … etc)
Meter communication Ports :
The meter shall have Optical Port for communication
between Meter and (PC and HHU).
The meter must have electrically isolated RS 485
communication port:
This port is used for Reading and Programming the meter.
The port capacity is 31 meters at least.
The meter must be provided with programmable address
number (Position Number) Programmable address should
be placed in 0.0.0 register, as ID for communication for AMR applications.
Communication protocol through optical and RS 485 port
shall comply to IEC 62056-21 direct local data exchange
IEC 62056-61 OBIS identification of registers, and 62056-62 interfaces classes.
The Meter should be DLMS/COSEM compatible.
Reading "DLMS" Meters remotely could be done via any
application without contacting /or supporting the manufacturing Meter's company.
Programmability of the meters:
Meters equipped with ETD for 4 tariffs must be easily
programmable. The software shall be delivered in the
form suitable either to be installed to PC for operation in laboratories or HHU, for operation in the field.
Meters must be setup quickly and easily by meter
laboratory or workshop personnel.
Meter Parameterization software :
The software should have customizable printing
Three Phase (X/5A) Meter Specifications Bid ( )
12 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
feature by task list.
The software must be compatible with Microsoft
The software must be able to export the Reading to
Microsoft Excel.
The software should have tow level of permissions at
o Administrator level: the administrator can do
all tasks and define users and give them the permissions and tasks
o Operator level: the operator can do only tasks
that determine by administrator.
The software must be enabled to install on any PC with
Microsoft Windows XP or higher operating system.
The software should be enabled to store all readings
and settings of meters.
All functions (Reading and Setting functions) of
software on PC must be enabled in HHU software with user permissions.
Ability to take reading from any meter by HHU by
entering No. of meter if user permissions allowed.
The software (PC and HHU) should be able to save
profile for meter setting.
The software (PC and HHU) must be able to reset
The software (PC and HHU) must be unable to reset
The software (PC and HHU) should able to draw
Calibration : The meter must be precision calibrated for
life at the factory, the routine test data must be delivered with each meter unit.
Life of meter in normal working conditions is at least
Meter component:
The meter should have non-violated memory to maintain
Three Phase (X/5A) Meter Specifications Bid ( )
13 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
data during power outage.
The meter should have lithium battery for time keeping
The processor should be manufactured by a famous USA,
West European or Japanese company.
The memories should be manufactured by a famous USA,
West European or Japanese company.
The lithium battery should be manufactured by a famous
USA, West European or Japanese company.
The type of packing should be suitable for export and
provide complete protection for marine or track or rail transportation and for loading, for example (Boxes, cases) should be robust enough and have suitable dimensions and weights.
The bidder will take care on his own account that the
commodity will be packed carefully in order to avoid damage of equipment and to be accepted to the insurance company.
Boxes, which should be handled with care according to
the content, must be marked accordingly and clearly.
Sufficient bands for boxes of sensitive instruments and
similar materials in accordance with their weight and dimension are to be used, and must be packed carefully to avoid exposure of elements to rain, sun, etc. with the appropriate packing or nylon bags oiled paper and foam materials.
Each meter should be packed separately and then
grouped into boxes.
Participation in testing and training:
The PEDE has the right to delegate two representatives
(engineers) to the contractor country to participate in the testing, for one week for each shipment.
The contractor will bear all expenses of testing
including accommodation, travel from and to Damascus (round trip) by plane, and travel in the contractor country etc.
The contractor shall send one expert man to Syria after
Three Phase (X/5A) Meter Specifications Bid ( )
14 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
receiving the first shipment for training PEDE engineers about method of installation, operation, setting, programming the meters,.
The PEDE has the right before contracting to delegate
two inspectors to visit the manufacture plant. The bidder will bear all expenses.
The training program shall be proposed by the
contractor and shall be checked and approved by PEDE
METER GUARANTEE:
The bidder shall guarantee the meters against all defects
arising out of faulty design or workmanship, or defective material for a period of two years from the date of provisional acceptance (see legal conditions).
PEDE has (Hand Held Units) with the following
hand held unit with (Battery and data charger)
Operating system WINDOWS MOBILE.
RAM: at least 64MB.
Flash Memory: at least 64MB.
CPU: at least 400 MHz.
Communication: Infrared Interface + USB.
Color touches Screen.
The contractor should submit software able to install and work on the (H.H.U) of PEDE.
Optical link for communication between meter and PC.
Manufacturer qualification :
The manufacturer should have the production capacity of
at least one million meter annually.
The manufacturer sales in the last three years should not
be less than one million meters.
Three Phase (X/5A) Meter Specifications Bid ( )
15 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
Bidder information : (to be filled by bidder)
Manufacturer Name :
Country of origin :
Customers reference List
a list including last three years clients :
Contact number
Contract subject & quantity
List of equipments
A list of equipments :
For production
For making tests.
Offered Meter Type :
Offered Meter Constant :
Related to item 24 of Guarantee schedule :
Processor manufacturer
Memories manufacturer
manufacturer Name & Website.
Three Phase (X/5A) Meter Specifications Bid ( )
16 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
9- Price Schedule
9-1 SPARE PART
LIST NO. (1) OF SPARE PART
Price(EURO)
NUMBER OF
CONTRACT
2 Terminal Cover
LIST NO. (2) OF ACCESSORIES
Price(EURO)
TOTAL UNIT TOTAL
Optical Link (Meter / PC)
Soft ware of the Hand Held Unites
RS 485 adaptor to RS232 (output port)
Total price
9-2 List of Training and Testing
Description
Unit Price
Total Price
Costs of training in Syria including all
expenses,
1*( man / 2weeks ) Participate in testing in manufacturer's
country,
2(man /weak) for each shipment
Total price
Three Phase (X/5A) Meter Specifications Bid ( )
17 1 8
SYRIAN ARAB REPUBLIC - MINISTRY OF ELECTRICITY PUBLIC ESTABLISHMENT FOR DISTRIBUTION OF ELECTRICITY
9-3 -PRICES SCHEDULE:
Price(EURO)
THREE PHASE ACTIVE AND
REACTIVE ENERGY STATIC METERS
SPARE PARTS ACC. TO LIST NO.1
ACCESSORIES ACC. TO LIST NO.2
List of Training & Testing (10)
GRAND TOTAL
GRAND TOTAL (in words CFR)
Three Phase (X/5A) Meter Specifications Bid ( )
18 1 8
Source: http://pede.com.sy/userfiles/file/X-5.pdf
Spice drugs: los cannabinoides como nuevas drogas de diseño Spice drugs: cannabinoids as a new designer drugs CRISTINA MUSTATA1, 2; MARTA TORRENS1, 3; 1 Unidad de Farmacología Humana y Neurociencias, Programa de Neuropsicofarmacología, IMIM-Hospital del Mar, Barcelona ICARDO PARDO1, 2; CLARA PÉREZ1, 2; THE PSYCHONAUT 2 Universidad Autónoma de Barcelona
Somatostatin and Epidermal Growth Factor Receptors: Implications in Breast Cancer Geetanjali Kharmate and Ujendra Kumar Faculty of Pharmaceutical Sciences, The University of British Columbia, Vancouver, BC, Canada. Received on May 30, 2013; Accepted on June 8, 2013; Published on June 22, 2013 Correspondence should be addressed to Ujendra Kumar; Phone: (604) 827-3660 , Fax: (604) 822-3035 , Email: [email protected]